Appendix 4D and Half-year Financial Report
Released
Released
Announcement PDF
Electro Optic Systems Holdings Limited
ACN 092 708 364
Consolidated financial statements for the half-year
ended 30 June 2024
This half-year report is provided to the Australian Securities Exchange
(ASX) under ASX Listing Rule 4.2A.3.
Current Reporting Period:
Half-year ended 30 June 2024
Previous Corresponding Period:
Half-year ended 30 June 2023
1
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Results for Announcement to the Market
Revenue and Net Profit
Percentage Change
%
Revenue from ordinary activities
Up
92.0%
Amount
($’000’s)
To
142,635
(Loss) after tax attributable to members
N/A
(3,002)
Net (Loss) attributable to members
N/A
(3,002)
Dividends (Distributions)
Amount per
security
Franked amount
per security
Cents per security
Cents per security
Final dividend
Nil
Nil
Interim dividend
Nil
Nil
Record date for determining entitlements to the dividend:
• Final dividend
N/A
N/A
• Interim dividend
Net Tangible Assets (NTA) at 30 June 2024 *
$183,340,427
Number of ordinary shares outstanding at 30 June 2024
192,952,099
NTA per ordinary share at 30 June 2024
95.0 cents per share
NTA per ordinary share at 30 June 2023
101.9 cents per share
* including Right of Use assets and lease liabilities recognised in accordance with AASB 16 Leases.
Brief Explanation of Revenue, Net Profit and Dividends (Distributions)
Refer to Review of Operations on pages 3 to 11.
No dividends have been declared or paid.
2
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
1. RESULTS FOR HALF-YEAR ENDED 30 JUNE 2024
Financial Results
The consolidated entity, consisting of Electro Optic Systems Holdings Limited (“Company") and the entities
that it controls, (“Group” or “EOS”) recorded Revenue of $142.6m, representing a $68.3m or 92.0%
increase on the prior corresponding period (30 June 2023: $74.3m).
The Loss After Tax, was $3.5m, compared to a loss of $32.4m in the prior corresponding period.
Underlying EBITDA was $11.5m for the half-year, compared to an Underlying EBITDA loss of $14.8m in the
prior corresponding period. Finance costs reduced by $3.5m, to $12.5m from $16.0m in the prior
corresponding period, due to the reduction of the debt principal amount.
The Net cash outflow from operating activities totalled $30.6m for the half-year, a decrease of $61.3m on
the prior corresponding period (30 June 2023: $30.7m inflow). The key changes in cash flows during the
half-year included additional payments to suppliers for long lead times items, an increase in the Middle
East contract asset which is expected to be realised in 2H 2024 and an increase in the interest paid in cash.
In addition, a scheduled $20.5m debt repayment occurred in April 2024.
A fully underwritten Placement and a Share Purchase Plan, which raised net proceeds of $35.4m was
successfully completed during the half-year. Excluding the net proceeds from equity raising, cash balances
decreased by $54.2m from 31 December 2023.
At 30 June 2024, the Group held cash totalling $52.2m (compared to $71.0m at 31 December 2023).
Key elements of financial performance of the Group are summarised below.
Revenue
The Group recorded Revenue of $142.6m for the half-year, representing an increase of $68.3m or 92.0 %
from the $74.3m in the corresponding period, with an increase in gross margin on materials to 44% in the
half-year from 35% in the prior corresponding period.
This increase in revenue was predominantly driven by the Defence segment which generated $101.4m in
the half-year vs $50.7m in the corresponding period, a 100% increase. Revenue in the Space segment also
increased to $41.3m in the half-year compared to $23.6m in the prior corresponding period, a 75%
increase.
The underlying driver of these revenue increases was higher activity levels, including continued delivery
of a key Defence contract to a customer in the Middle East and activity on the EM Solutions contracts.
At 30 June 2024, the Group had a backlog order book of contracted work of over $386m. This represents
work secured under customer contracts, mainly in Defence Systems and EM Solutions. This work is
expected to be largely undertaken through the remainder of 2024 and throughout 2025 and 2026.
In addition to the secured contract backlog of over $386m, the group has $181m of conditional contracts
with customers in Ukraine. These conditional contracts were signed in April 2023 and are subject to
various conditions being met, including the completion of demonstration testing. More details are
included in the section on Defence Systems, below.
3
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
Expenses
Expenses increased to $152.5m in the half-year from $112.5m in the prior corresponding period. This
increase was primarily driven by increased materials costs of $32.2m to support the higher revenue
achieved. Employee benefits expenses, and Administrative and other expenses have increased by $4.2m
and $6.4m respectively from the prior corresponding period due to the increased levels of business activity
in the current period. The decrease in finance costs of $3.5m is due to repayment of borrowings in
September 2023 and April 2024.
Underlying EBITDA
Underlying EBITDA (prior to foreign exchange gains) was a profit of $11.5m, compared to an Underlying
EBITDA loss of $14.8m in the prior corresponding period.
EBITDA
Period ended
30 June 2024
$m
Period ended
30 June 2023
$m
(Loss) for the period
(3.5)
(32.4)
Income tax (benefit)
(0.0)
(3.0)
(Loss) before tax
(3.5)
(35.4)
Finance costs
12.5
16.0
Foreign exchange (gains)
(5.1)
(2.4)
Underlying EBIT gain/(loss) (before foreign exchange gains)
3.9
(21.8)
Depreciation and amortisation
7.6
7.0
Underlying EBITDA gain/(loss) (before foreign exchange gains)
11.5
(14.8)
Foreign Exchange
The results include a foreign exchange gain in the half-year of $5.1m compared to a gain of $2.4m in the
prior corresponding period, which predominantly arose on the translation of US Dollar assets into
Australian Dollars.
Contract Asset
The Group recognises a contract asset, being revenue recognised on projects that has not been invoiced
to customers. The timing of the recognition of revenue is in accordance with the Australian Accounting
Standards. Amounts are invoiced to customers in accordance with legal arrangements specified in
customer contracts.
At 30 June 2024, the Group had a contract asset totalling $89.7m (31 December 2023 $68.0m), being
revenue earned but not invoiced, mainly on a project with a significant customer in the Middle East. This
increase of $21.7m was due to revenue recognised during the half-year exceeding invoices issued to
customers.
The invoicing of the amounts in the contract asset and the realisation of cash has been a critical focus for
the Group. The Group expects this increased level of contract asset to be temporary and to convert into
cash proceeds over the course of the remainder of 2024 and 2025.
4
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
As at 30 June 2024, the trade receivables balance increased by $24.8m from 31 December 2023. The
increase was due to invoicing prior to 30 June 2024 that is expected to be collected during second half of
2024.
Contract Liabilities
The Group recognises contract liabilities for amounts that have been received from customers as advance
payments on projects. During the half-year, contract liabilities have increased by $17.4m to $38.0m at 30
June 2024 (31 December 2023: $20.6m).
The net contract asset was $51.7m at 30 June 2024, an increase of $4.3m since 31 December 2023.
Cash Balance
The cash balance held by the Group at 30 June 2024 was $52.2m a decrease from $71.0m at 31 December
2023.
Cash Generated in Operating Activities
During the half-year, the Group had net cash outflow from operating activities of $30.6m, compared to
net inflow of $30.7m in prior corresponding period, representing a net decrease in cash flow of $61.3m,
driven by investment in long lead time inventory items.
Net cash outflows from operating activities was caused predominantly by increased Payments to Suppliers
and employees of $137.0m, an increase of $47.9m from the prior period as a result of higher production
during the current period to complete key milestones across projects.
The cash receipts from customers are impacted by the timing of contract asset realisation. Revenue and
contract assets have increased compared to the prior corresponding period, and the Group is expected to
convert these contract assets into cash over the course of the remainder of 2024 and 2025.
Interest and other costs of finance paid increased by $11.6m from the prior period due to the $4.5m
amendment fee paid to the lender to resolve the commercial dispute with the lender (as announced on
22 December 2023), and the fact that interest on finance facilities was paid in cash in the current period
rather than being capitalised in the prior period.
Cash Flow Used in Investing Activities
The Group had net cash inflow of $0.7m from investing activities during the half-year, a $6.8m
improvement from the net cash outflow in the comparative period of $6.1m.
The investing activities include a $8.3m cash inflow from the release of a cash security deposit on
performance bonds from a funding provider. This was offset by $6.2m increased cash security required on
performance bonds and $1.4m of payments for the acquisition of property, plant and equipment.
Cash Flow Used in Financing Activities
Net cash inflows of $12.4m from financial activities were achieved during the half-year, compared to a net
outflow of $3.9m in the prior period. The cash movement included the repayment of the second working
capital facility, and the funds received from equity raise.
During the half-year, the Group undertook an equity raise through a fully underwritten Placement and a
Share Purchase Plan, as announced on 22 March 2024 to accelerate business growth. The Group
successfully raised $33.6m (net of fees) via a fully underwritten placement of approximately 20.6m new
fully paid ordinary shares on 25 March 2024. The Group has raised an additional net $1.7m via a share
purchase plan on 22 April 2024.
Proceeds from the equity raise have been and will continue to be applied to support future sales growth
in key global markets, through investment in long lead time critical supplies, specifically Remote Weapon
5
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
System (“RWS”) cannons, other long lead time equipment components and security deposits for bank
guarantees.
The Group repaid $20.5m to retire its second Working Capital Facility which matured on 11 April 2024.
As at 30 June 2024, the Group had a fully drawn Term Loan Facility with principal of $35.0m, which matures
on 11 October 2025. The total debt repayment obligation of $52.1m due on this date includes principal,
establishment fees and interest accrued, not paid in cash, to that date. The borrowing facility agreements
include a 100% ‘make whole’ clause which applies in the case of any early repayment.
2. DETAILED SEGMENT UPDATE
DEFENCE SYSTEMS
Defence Systems had a positive H1 2024, with revenue increasing 100% to $101.4m in the half-year from
$50.7m in the prior corresponding period. This $50.7m increase included the impact of the continued
focus on the contract for a large customer in the Middle East and supply to a Western European
government customer.
The main activity during the half-year was the manufacture and delivery of RWS.
Market Overview and Sales Activity – Defence Systems
During the half-year, EOS has continued contract negotiations in relation to the supply of RWS to Hanwha
for the Land 400 Phase 3 Project in Australia. EOS expects these contract negotiations to continue through
H2 2024. The project will see Hanwha delivering 129 vehicles to the ADF in 2027 and 2028.
Subject to the outcome of these negotiations, it is anticipated that the Land 400 Phase 3 project now has
the potential to give rise to revenues for the Group from 2026 onwards. There is no certainty that any
particular outcome or transaction will result from these discussions.
The Defence Systems business continued to deliver products to key customers including in the Middle East
and Australia. In addition, the Defence Systems business incurred costs and cash outflows in product
manufacturing costs, operating costs and staff costs.
EOS is experiencing increased counter-drone demand. The Group commenced systems delivery under the
contract announced in January 2024 to supply Euro9m (approx. A$15m) of Slinger counter-drone systems
to Diehl Defence in Germany. Production of remaining systems is currently underway, and deliveries are
expected to be completed in 2024. In addition, a contract valued at $5m to supply RWS to a customer in
Australia was signed during the half-year.
In 2023, two conditional contracts with Ukraine were announced. These contracts are conditional on
demonstration testing and other customary terms for military contracts. Following demonstrations during
2023, EOS products were approved during 2023 by the Ukrainian authorities for purchase as required.
EOS is now working with the Ukrainian end-users and customers to allow committed orders to be placed
under the conditional contracts. Further demonstration testing is planned to occur in Ukraine during 2024.
During the half-year EOS continued to deliver under a contract (announced on 27 December 2023) to
supply additional RWS units to a Western European Government. These systems are in addition to an
earlier contract announced on 13 June 2023 (for approximately A$51m), which was delivered mainly in
Q3 2023. The remaining milestone is expected to be delivered in second half of 2024.
6
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
The Group continues to be in active discussions and contract negotiations for the provision of RWS and
related components with other potential customers. These opportunities have the potential to materially
improve revenue and cash flow in future years. There is no certainty that any particular outcome or
transaction will result from these discussions and negotiations.
Product Development – Defence Systems
Defence Systems continued to develop its intellectual property and further commercialise its product
range during the half-year. Typically, new product launches in the defence industry can take one to three
years to achieve sales and develop commercial maturity:
• EOS continued discussions with potential customers for the R150 RWS (launched during 2023) and
the R800 RWS (launched during 2023). In addition, EOS was in discussions with customers about
the development and supply of RWS for the marine market (i.e. naval applications).
• Following the 2023 launch of the flagship Slinger counter-drone system, work continued to meet
strong demand for counter-drone solutions. In addition to ongoing efforts to demonstrate the
Slinger counter-drone system capabilities to customers, in July 2024, the Group also successfully
demonstrated its Laser Dazzler at the CUAS Sandbox event in Canada. The Laser Dazzler can be
integrated into EOS’ existing RWS, giving operators the flexibility to use either kinetic or nonkinetic electronic warfare measures against aerial threats.
• EOS and the Australian Defence Force (ADF) Robotic and Autonomous Systems Implementation
& Coordination Office (RICO) demonstrated the advanced long-range firing capabilities and
precision of EOS' R400 RWS, remotely controlling an RWS from approximately 550km away to
destroy ground targets.
• Capabilities of an R600 RWS were demonstrated on a US Army Small Multipurpose Equipment
Transport (S-MET) robotic infantry support vehicle. Using this platform, EOS successfully shot
down pairs of Class 1 drones at ranges of more than 300m and engaged multiple ground targets
with 30mm cannon from this robotic platform.
• EOS received a request from a large potential customer in the United States to develop an
autonomous capability for the Slinger counter-drone system, and EOS intends to work on this in
2024 and 2025.
• EM Solutions worked on a concept development for a new mid-size naval satellite communication
terminal as well as various upgrades to its existing core Cobra and King Cobra products.
Prototype High Energy Laser Weapons
Commercial discussions continued with a number of potential customers for its High Energy Laser Weapon
system. In particular, discussions with two potential international customers are at a more advanced
stage. These discussions are ongoing and could result in new customer agreements being signed during
2024 or later.
New Singapore entity
On 15 April 2024, the Group established a new 100% owned company, ‘EOS Innovation Singapore Pte Ltd’,
to carry out new product development work on our High Energy Laser Weapon system as a Laser
Innovation Centre in Singapore.
7
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
SPACE SYSTEMS
Revenue in the Space Systems segment increased 75% to $41.3m in the half-year from $23.6m in the prior
corresponding period. Space Systems comprises two business units, Space Technologies and EM
Solutions.
Space Technologies
Space Technologies delivers space domain services (providing information on objects in space) and
advanced manufacturing (which includes the design, building and deployment of telescope and
observatory equipment). Space Technologies also develops technologies that support Optical
Communications (using lasers) and Space Control activities.
During 2024, Space Technologies continued to grow and commercialise its technology. This included
delivering satellite laser ranging services to longstanding customers, and the successful completion of a
beam director assembly for a foreign customer. Space Technologies continued to secure small contracts
with international customers for Space Domain Awareness services and have successfully delivered on
contract requirements.
In April 2024, Space Technologies secured a $5m contract with the ADF Joint Capabilities Division in
Australia to further develop space capabilities. Subsequent to the end of the half-year, a further contract
was awarded for $9m.
KiwiStar Optics continues to deliver against several contracted programs for a broad range of international
customers.
During the period, discussions were held with various potential partners to develop opportunities for
Space Technologies in the emerging market for Space Control solutions. Discussions to date have focussed
on the Group’s unique capabilities and potential opportunities for the Group to secure product
development funding. These discussions are expected to continue for the remainder of 2024.
Space Technologies continues to develop sales opportunities on a range of potentially significant future
projects for Australian and overseas customers. These will help underpin future strategic growth
initiatives, including in Space Control solutions. Typically, it can take a year or more for opportunities to
be developed and converted to signed sales agreements.
EM Solutions
EM Solutions designs, builds, deploys and maintains on-the-move satellite communication equipment
systems for defence forces. EM Solutions’ main products include satellite communication terminals and
antennae for naval vessels and other marine applications.
During the half-year, EM Solutions continued to focus on delivering growth through developing overseas
markets, the delivery of satellite communication systems to naval customers in Australia and Europe, and
working closely with customers to develop leading products.
In the half-year to 30 June 2024, the EM Solutions business:
•
•
•
continued to deliver against a previously announced (approximately $202m) long-term contract
to supply terminals to the Royal Australian Navy, with two key design milestones now completed;
continued work on its $26m three-year sustainment contract for the Royal Australian Navy’s
existing fleet of Cobra Maritime SATCOM terminals;
continued to deliver its Cobra Maritime SATCOM terminals to customers in Europe;
8
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
•
•
was part of the team selected as preferred tenderer to deliver the Australian Defence Forces
(“ADF”) new military satellite communications capability; and
secured customer orders valued at $19m to supply additional Satellite Communication Terminals
and Radio Frequency components to an existing customer, and to a new East Asian customer.
In July 2024 EM Solutions received a further $4m order from a European NATO Navy for its King Cobra
terminals.
EM Solutions continues to work closely with the ADF to support the Royal Australian Navy and other
customers.
New EMS international entity
On 19 April 2024, the Group established a new trading entity EM Solutions (Europe) B.V. in the
Netherlands to support the EMS growth agenda in Europe in future years.
3. LONG-TERM INCENTIVE
During the half-year to 30 June 2024, 2,100,000 share options and 1,260,000 share rights were issued to
the Managing Director/CEO following approval at the AGM.
There is no change in share capital as a result of these allocations and it is anticipated that upon vesting,
these allocations will be funded, to the fullest extent possible, by shares already issued and held in trust
as lapsed shares under the existing Loan-Funded Share Plan.
4. OFFSET CREDIT OBLIGATION
The Group is obligated as part of its contract to supply a customer in the Middle East, to contribute to
economic development in the country as an offset against purchases of its products and services (“Offset
Program”).
This commitment is secured by an offset bond of US$16.9m (A$25.6m) which is guaranteed by Export
Finance Australia. In respect of the bond, a cash security amount of US$13.7m (A$20.7m) has been placed
on deposit. These are included in the cash security deposits.
Under the Offset Program, Offset Credits can be earned by:
(i)
investing in the country;
(ii)
engaging in contracts that support local industry; or
(iii)
making other contributions.
This is a common requirement for suppliers like EOS. Under the Offset Program guidelines, participants
typically have several years in which to earn Offset Credits. As an alternative to generating Offset Credits
through the Offset Program, in certain circumstances Offset Credits can be generated through
participation in the Credit Purchase Program, which involves settling obligations by making cash payments.
As part of the Offset Program, EOS is required to develop, agree and submit an approved business plan to
the Offset Credit authority. EOS submitted a business plan during September 2023, which was within a
time limit specified by the Offset Credit authority. The business plan remains under review by the Offset
Credit authority and the Group continues to have advanced discussions with the Offset Credit authority
towards finalising this approval. EOS believes the extended timeframe for approval is not unusual in this
jurisdiction and is not unexpected.
9
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
During Q1 2024, EOS entered into a non-binding memorandum of understanding (“MOU”) with Shielders
Advanced Industries, a specialist manufacturer in the Middle East. The MOU envisages a JV with EOS that
focusses on local manufacturing and assembly of RWS and assists EOS in meeting its Offset Obligations in
the Middle East.
As a result of the above, EOS considers that it is currently in compliance with its obligations. In the event
that EOS does not comply with its obligations in future, the Offset Credit authority is entitled to demand
payment under the guarantee outlined above. EOS intends to continue to work to ensure it complies with
its obligations. EOS expects to reach agreement on an approved business plan, and to ultimately generate
offset credits by executing that business plan. EOS does not expect to settle the offset obligation in cash,
either through the Credit Purchase Program or the bank guarantee.
5. LEADERSHIP CHANGES
The following leadership changes were announced during the half-year:
• The appointment of Mr Christian Tobergte as Executive Vice President Defence Systems
International to lead international growth in the Defence Systems business outside of Australia.
This role will be based in Europe.
• Mr Ian Cook was appointed as Executive Vice President Defence Systems Australia in November
2023 to lead growth in our Australian business and to focus on global engineering, supply chain
and manufacturing activities.
• Mr Clive Cuthell has been appointed Chief Operating Officer in addition to his existing role as Chief
Financial Officer, to focus on execution of key group initiatives to support growth.
• EOS brought its company secretary function fully in house during the half-year. Ms Leanne Ralph
resigned as Joint Company Secretary, leaving EOS employee Ms Melanie Andrews (appointed 26
March 2024) as the sole Company Secretary.
These changes expected to further enable EOS to grow the business in international markets, including
the high-growth counter-drone market.
6. SUBSEQUENT EVENTS
There were no significant subsequent events arising after 30 June 2024 and up to the date of this report.
10
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Review of Operations
7. OUTLOOK
As outlined above, work continues throughout the Group on several initiatives, to continue growth and
improve profitability, cash flow outcomes, funding and returns.
Market and Customer Outlook
The global market for the Group’s products remains supportive. This is largely due to the ongoing conflicts
in Ukraine and the Middle East and rising tensions in other locations. This thematic continues to positively
impact on customer demand. In particular, the counter-drone market is fast growing and represents a
high-profile market opportunity for the Group.
The Group operates in an industry where it can typically take up to, and beyond, twelve months for new
market opportunities to be converted into signed sales contracts. The Group continues to pursue a
number of material opportunities in different markets, including Europe, the Middle East, North America,
South East Asia and Australia.
Outlook for Revenue and Cash Receipts
The Group continues to focus on maximising receipts from customers, including seeking contract
amendments where appropriate, as well as securing and delivering on new sales contracts that are cashpositive. Cash receipts include receipts from customers in Europe, the United States, the Middle East,
South East Asia and Australia.
The Group’s activities include the sale of products under a small number of relatively large projects.
Typically, both the recognition of Revenue and Cash Receipts from customers are governed by the
achievement of project milestones and legal arrangements specified in customer contracts.
Changes in project timing, and the timing of the Group’s revenue and cash receipts, can arise due to
unplanned changes in circumstances. This can include delays at the customer, delays at the customer’s
other suppliers, delays at the Group and delays at the Group’s suppliers.
The level of future revenue and future cash receipts from customers will depend on the achievement of
product manufacturing and delivery milestones, compliance with detailed contractual requirements,
ongoing customer relationships and the outcome of commercial discussions and negotiations.
Historically, owing to a high level of customer concentration and specific contractual arrangements, both
revenue and cash receipts have been difficult to predict with certainty.
The Group will continue to closely monitor its cash flows and the outlook for the business, to ensure that
adequate funding is in place, and if necessary, seek to amend the Group capital structure.
The Group will continue providing regular updates during the year in line with its continuous disclosure
obligations.
This announcement has been authorised for release to ASX by the Board of Directors.
Further information:
Andreas Schwer
Group CEO
27 August 2024
11
ELECTRO OPTIC SYSTEMS HOLDINGS LIMITED
Directors’ Report
The Directors of Electro Optic Systems Holdings Limited (the “Company”) submit herewith its half-year
financial report of the Company and the entities it controlled (“Group” or “EOS”) at the end of, or during, the
half-year ended 30 June 2024.
In order to comply with the provisions of the Corporations Act 2001, the Directors report as follows:
Directors
The names of the Directors of the Company during or since the end of the half-year are:
1.
2.
3.
4.
5.
6.
Mr Garry Hounsell (Chair)
Dr Andreas Schwer (CEO)
Mr Geoffrey Brown AO
Ms Kate Lundy
Mr David Black
Mr Robert Nicholson
Review of Operations
A detailed review of operations is included on pages 3 to 11 of this financial report.
Company Secretary
In May 2024 EOS brought its company secretary function fully in house. Ms Leanne Ralph resigned as Joint
Company Secretary on 31 May 2024, leaving EOS employee Ms Melanie Andrews (appointed 26 March 2024)
as the sole Company Secretary.
Rounding of amounts
The Company is a company of the kind referred to in ASIC Corporations (Rounding in Financials/Directors’
Reports) Instrument 2016/191, dated 24 March 2016, and in accordance with that Corporations Instrument,
amounts in the financial report are rounded to the nearest thousand dollars, unless otherwise indicated.
Auditor’s independence declaration
The auditor’s independence declaration as required under section 307C of the Corporations Act 2001 is
included on page 13 of this half-year financial report.
Signed in accordance with a resolution of the Directors made pursuant to s.306 (3) of the Corporations Act
2001.
On behalf of the Directors
Garry Hounsell
Director and Chair
Canberra, 27 August 2024
12
Ernst & Young
121 Marcus Clarke Street
Canberra ACT 2600 Australia
GPO Box 281 Canberra ACT 2601
Tel: +61 2 6267 3888
ey.com/au
Auditor’s Independenc
Share your feedback
Discover